This is looking at Ollie's room- bracing done and the window starting to be framed.
The bathroom framing has started - with the toilet being framed. We also have the the framing done for the walk in robe.
The kitchen with the window framing done. This window is going to be a sliding window and screen allowing for this to be used as a servery
Cath and Ollie looking out of the ensuite.
Additions to the dam. Where possible we are going to try non chemical ways of dealing with with different issues with the block - one big issue is the mosquitos - so we bought 20 Pacific Blue eye and put them in the dam, with the hope that they will bring down the Mosquito population.
No comments:
Post a Comment